|
Right elevator plans.
|
|
E-720 Stiffeners for the left and right elevator are cut to fit. Since I'm building the right elevator first I preassembled the left elevator to see how it will go together. 8/26/06
|
|
Back on the right elevator. I cleaned up the E-720 stiffeners with the scotch bright wheel and then clecoed and match drilled them to the E-701skin. 8/26/06
|
|
Removed the blue plastic from the rivet lines. Time to debur the skins and prime the stiffeners. 8/26/06
|
|
9/6/06
|
|
9/6/06
|
|
9/11/06
|
|
9/11/06
|
|
E-714 Counterweights. Left was 2 pounds 8 ounces, and the right is now 2 pounds 0 ounces. 9/17/06
|
|
9/11/06
|
|
9/17/06
|
|
9/17/06
|
|
9/18/06
|
|
9/18/06
|
|
9/18/06
|
|
9/18/06
|
|
9/18/06
|
|
9/18/06
|
|
9/17/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/19/06
|
|
9/25/06
|
|
9/25/06
|
|
9/25/06
|
|
Left elevator plans.
|
|
10/2/06
|
|
10/2/06
|
|
10/3/06
|
|
10/4/06
|
|
10/7/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|
|
10/6/06
|